Construction machinery shipping from China to Kazakhstan
An excavator or loader often exceeds the width or height limit. We calculate the loaded dimensions in advance, handle the permit and customs, and the machine arrives ready to work.
Machinery we move
- Excavators and loaders
- Bulldozers and rollers
- Truck cranes and loader cranes
- Mining machinery
- Agricultural machinery
Dimensions on the trailer
Height includes the deck, so the same machine may or may not be within limits depending on the trailer. We choose a trailer to avoid a permit where possible and obtain one in advance where not.
Customs and certificates
Machinery needs certificates under EAEU technical regulations. We check them by HS code before loading.
Frequently asked questions
How many units can you move?
From one machine to project batches of 20–150 trucks.
Does machinery need certification?
Usually, under EAEU technical regulations. We check before loading.
Can I avoid a permit?
Sometimes: with a low deck the load can stay within 4 m in height and 2.55 m in width. The calculation shows it.
See also
Low-bed transport
Low-bed trailers for heavy and tall equipment: trailer selection, axle load calculation, lashing plan and crane transloading at the border arranged in advance.
Dimension and axle limits
Width 2.55 m, height 4 m: which dimensions and axle loads are allowed without a permit in Kazakhstan, which orders apply and how to check your vehicle combination.
Customs clearance
Turnkey import clearance in Kazakhstan: the broker files before the truck reaches the border, so cargo does not sit in the bonded warehouse. HS codes and EAEU certificates included.
Karaganda
Freight from China to Karaganda, turnkey: customs, permits and oversize. The truck leaves the border the day the cargo arrives, and you follow it in the portal.
Preparing an equipment shipment?
Send drawings and the packing list — we will show what data is missing and come back with a preliminary estimate.