Solar and wind equipment logistics to Kazakhstan
A solar plant is built in batches: panels, mounting structures, inverters, storage. We ship on the construction schedule, and large items such as blades and transformers go as oversize.
What we move
- Solar panels
- Mounting structures
- Inverters and energy storage
- Substation transformers
- Wind turbine components
Large components
Wind blades and tower sections are long oversize loads. They need a permit, a turn survey and escort.
Customs
For electrical equipment we check EAEU technical regulation requirements by HS code before loading.
Frequently asked questions
Can panels go in standard trucks?
Yes, panels and structures usually stay within limits. Transformers and wind components are the oversize part.
How do you ship a large batch?
Trucks go on the construction schedule, and the project portal shows every truck.
Do inverters need certificates?
Usually yes. We check by HS code before loading.
See also
Transformers and reactors
Power transformers, reactors and tanks: trailer matched to mass, axle load calculation, special permit, bridge checks and escort to the substation.
Full truckload
Dedicated trucks from China to Kazakhstan, from one truck to a batch of 200 under one team. Border slots booked in advance, customs and documents included.
Customs clearance
Turnkey import clearance in Kazakhstan: the broker files before the truck reaches the border, so cargo does not sit in the bonded warehouse. HS codes and EAEU certificates included.
Shenzhen
Freight from Shenzhen to Kazakhstan, turnkey: we collect in China, cross the border without idle days, and handle customs and documents. Follow the truck without calls.
Preparing an equipment shipment?
Send drawings and the packing list — we will show what data is missing and come back with a preliminary estimate.