Shipping from China to Oskemen
Oskemen (Ust-Kamenogorsk) is the non-ferrous metallurgy centre of East Kazakhstan. We deliver from China to Oskemen turnkey: trucks, customs, documents and oversize from one team.
Which crossing
Bakhty — Baketu and Maikapchagai — Jeminay are closer. We compare them with Dostyk for the specific cargo.
What we move
- Metallurgical equipment
- Mining equipment
- Construction machinery
- Construction materials
Transit without idle days
Cargo usually waits 10–15 days at the border. We prepare documents, permits and equipment before arrival, so the truck leaves the crossing the same day and the time to Oskemen depends only on the road.
Frequently asked questions
How long does freight from China to Oskemen take?
The road depends on the origin city in China and the crossing. What matters is not waiting at the border: usually 10–15 days, while our truck leaves the day the cargo arrives. The exact time comes with the quote.
Which crossing is best for Oskemen?
Bakhty — Baketu and Maikapchagai — Jeminay are closer. We compare them with Dostyk for the specific cargo.
Do you move oversize cargo to Oskemen?
Yes: low-bed trailer, special permit, route survey and escort to the site.
See also
Bakhty — Baketu
Bakhty — Baketu is a road crossing in the east, opposite Tacheng (Chuguchak). It is convenient for cargo to the Abai and East Kazakhstan regions. How to pass without idle days: slot booked early, documents with the broker before arrival, equipment waiting.
Maikapchagai — Jeminay
Maikapchagai — Jeminay is a small road crossing in the east of the country, used for cargo to the East Kazakhstan region. How to pass without idle days: slot booked early, documents with the broker before arrival, equipment waiting.
Construction machinery
Excavators, loaders, cranes and mining machinery from China: low-bed trailer, dimension check, permits, customs and EAEU certificates included.
Industrial equipment
Industrial equipment from a Chinese factory to your site in Kazakhstan: documents, customs, low-bed trailer, permits and unloading. Installers do not wait.
Preparing an equipment shipment?
Send drawings and the packing list — we will show what data is missing and come back with a preliminary estimate.