Skip to content
MOSTASIA
Cargo

Steel structure shipping from China

Steel goes to site on the erection schedule, and one late truck stops the crew. We plan shipments in erection order and keep trucks moving through the border.

What we move

  • Trusses, columns and beams
  • Bridge spans
  • Rolled steel
  • Structures for industrial buildings

Long loads

Long cargo can exceed the combination length limit. Then we obtain a permit and plan the turns on the route and the site access.

On the erection schedule

A batch is split into trucks in erection order. The portal shows where each truck is and when it reaches the site.

Frequently asked questions

Do long members need a permit?

If the combination exceeds the length limit, yes. The dimension calculation shows it.

How is steel lashed?

The lashing plan is agreed before loading and checked before release.

Can you ship in batches?

Yes, trucks go in erection order, from one truck to projects of 20–150.

See also

Preparing an equipment shipment?

Send drawings and the packing list — we will show what data is missing and come back with a preliminary estimate.

Request a quote